Energy Optimization Furnace

Energy Optimization Furnace

Due to use of 80 to 85% hot metal approximately 10% DRI and plant return scrap, primary steel from EOF is virgin steel with low tramp element low phosphorus and low oxygen potential. Oxygen blowing through submerged tuyeres, supersonic lance and atmospheric injection.
 Parameter Description
Technology Minitec, Brazil
Size of the furnace 35 MT
Hot metal 80% to 85%
Tap to tap time 40 to 50 min
No of bottom Shells 1+1
Capacity 3,00,000 TPA